Trikaan
  • Anvaya

    AnvayaConnected business operations - supply chain, sales, finance, HR and more on one platform.

    ASTR AI Suite

    ASTR ProductionProduction intelligence - recipes, smart BOM, costing, planning and quality.Astr AIThe AI layer across every Trikaan product - ask, analyse and automate in plain language.ASTR Drawing & Plan GeneratorTurn customer drawings into BOM, BOQ, cutting lists and production plans.ASTR Reporting AssistantAsk in plain language - get reports in Excel, PDF, CSV or PPT in seconds.Machine Digital TwinLive machine models connected to PLC & SCADA data for OEE and maintenance.

    Agriculture

    Seed TrackField intelligence for seed production - growers, fields, visits, QA and yield.
    Not sure which product fits your business?Book a Demo →
  • Industries

    FurnitureFrom concept to engineering, powered by AI.FMCGFrom product planning to market execution.PharmaceuticalFrom formulation to compliance.AutomotiveFrom component design to vehicle manufacturing.Food & BeverageFrom ingredients to finished products.ConstructionFrom project planning to execution.ChemicalFrom chemical formulation to process optimisation.Agri & SeedFrom grower’s field to sealed seed bag.
    Industry-specific solutions. Powered by ASTR.All industries →
  • Build & Integrate

    Software built around your process

    Workflow Digitisation & OptimisationCustom Application DevelopmentERP & Systems IntegrationMobile & Field ApplicationsData Migration & Legacy Modernisation

    Engineering & Automation

    From drawings to the shop floor

    Drawing-to-Production EngineeringPLC, SCADA & Hardware IntegrationDigital Twin & 3D Plant ModellingPredictive Maintenance & OEEAI Reporting & Analytics

    Operations

    Run the business on connected data

    Procurement & Supply ChainInventory & Warehouse SolutionsProduction Planning & SchedulingQuality & Compliance SystemsCosting & Margin Intelligence

    Industry Services

    Industry-focused services

    Manufacturing SolutionsAgri & Seed SolutionsConstruction & Interior SolutionsImplementation, Training & Support
    Beyond software - we engineer around your business.All services →
  • Engineering

    How We WorkEngineeringData SecurityData PrivacyCloud & Hosting

    Your vision. Our engineering.

    Explore our engineering capabilities →
  • Pricing
  • FAQ
Book a Demo
  • Home
Trikaan

Your Business. Connected Through Intelligence.

Company

Who we areHow we workEngineeringPricingCareersBlogContact

Solutions

Seed TrackAnvayaASTR ProductionASTR DrawingASTR ReportingMachine Digital TwinIndustries

Services

All servicesWorkflow DigitisationSystems IntegrationPLC & SCADACustom EngineeringNetwork Security & VPN

Trust & Legal

Data securityData privacyCloud & hostingPrivacy PolicyTerms of ServiceCookie Policy

© 2026 Trikaan Solutions Pvt. Ltd. All rights reserved.

PrivacyTermsCookies

A transformation programme your board can govern and your plant floor will actually use.

Large programmes fail for predictable reasons: unclear ownership, scope that drifts, users who were never asked, and value nobody measured. Our delivery model is built to remove each of those, with gates, named owners and a value baseline from week one.

One accountable lead

A named engagement lead owns outcomes, timelines and commercials end to end.

Gates you sign

No phase closes without written sign-off from your side.

Value baseline first

We measure today’s numbers before we change anything.

No lock-in

Documented, exportable and handover-ready at every stage.

01 · Designed against failure

Why digital programmes in manufacturing stall — and what we do about each.

What usually goes wrongEarly warning signOur built-in control
No single ownerDecisions wait for “the meeting”Named sponsor and product owner on both sides, documented decision rights
Scope driftRequirements grow every weekBaselined scope, formal change requests with impact on time and cost
Built for the boardroom, not the floorLow usage after go-liveOperators in research, prototype tests and UAT; plant champions
Bad master dataGo-live delayed for “cleanup”Data-quality profiling in assessment; cleansing as a tracked workstream
Integration surprisesERP sync issues found at UATIntegration contract and test harness in the design phase
Big-bang cutoverAll plants at once, no fallbackPilot, template, waves; parallel run and rollback plan per site
Value never measuredSuccess judged by opinionValue scorecard with baselines, owners and monthly reporting

02 · Ways to engage

Start where the risk is lowest. Scale where value is proven.

2–4 weeks

Plant assessment

Structured study of one plant or business unit: process, data, systems and machines.

You get

  • •Assessment report
  • •Opportunity list with value estimate
  • •Phased roadmap

Best when: You need a clear, evidence-based case before committing budget.

8–14 weeks

Pilot

One plant, one department or one value stream taken live with full governance.

You get

  • •Live system
  • •Measured results vs baseline
  • •Rollout template

Best when: You want proof on your own floor before scaling.

Multi-quarter

Enterprise programme

Multi-plant rollout across modules and integrations, delivered in waves.

You get

  • •Programme office
  • •Wave plans per site
  • •Value scorecard

Best when: The case is proven and you are ready to standardise.

Ongoing

Managed services

We run, support and improve the platform with agreed service levels.

You get

  • •Help desk & SLAs
  • •Release management
  • •Quarterly value reviews

Best when: You want outcomes without growing an internal team.

03 · The programme lifecycle

Seven phases. Each ends at a gate you sign — or we don’t move on.

PHASE 01 · 2–4 weeks

Assess

Understand how the business really runs and where value is.

EXIT GATE

Opportunities, scope and value scorecard agreed.

Signed by: Executive sponsor

Activities

  • •Stakeholder interviews, CXO to operator
  • •Gemba walks and shift shadowing
  • •System, data and machine survey
  • •Loss trees and opportunity sizing
  • •Value baseline

Deliverables

  • Assessment report
  • Value scorecard draft
  • Roadmap and budget range

From your side

Access to plants, people and data; a sponsor and a product owner.

PHASE 02 · 3–6 weeks

Design

Turn the agreed scope into processes, screens and integrations your users have already tried.

EXIT GATE

Solution design, integration contract and plan signed off.

Signed by: Product owner and IT head

Activities

  • •To-be process flows per plant
  • •Clickable prototypes tested with operators
  • •Integration contract with your ERP
  • •Master data standards and cleansing plan
  • •Roles, approvals and reports defined

Deliverables

  • Solution design document
  • Prototype and test notes
  • Integration contract

From your side

Process owners for workshops; IT for integration decisions.

PHASE 03 · 6–12 weeks

Build

Configure and build in two-week sprints, with working software shown at every demo.

EXIT GATE

All scoped features demonstrated on staging.

Signed by: Product owner

Activities

  • •Sprint planning against the baselined scope
  • •Configuration and custom build
  • •Integration build with test harness
  • •Data migration rehearsals
  • •Fortnightly demos to process owners

Deliverables

  • Working system on staging
  • Migration scripts and rehearsal logs
  • Admin and user guides (draft)

From your side

Process owners at demos; timely decisions on open questions.

PHASE 04 · 2–4 weeks

Validate

Prove the system against real scenarios, real data and real users before anything goes live.

EXIT GATE

UAT passed with no open critical defects.

Signed by: Product owner and plant head

Activities

  • •System and integration testing
  • •UAT with operators and supervisors
  • •Performance and security checks
  • •Final data migration dry run
  • •Training of trainers and champions

Deliverables

  • UAT sign-off pack
  • Defect log and closure report
  • Cutover runbook

From your side

Key users for UAT; plant champions nominated.

PHASE 05 · 1–2 weeks

Go live

Cut over plant by plant with a rehearsed runbook, a parallel run where needed and a rollback plan.

EXIT GATE

System live, data reconciled and go-live checklist closed.

Signed by: Executive sponsor

Activities

  • •Go / no-go review
  • •Final data load and reconciliation
  • •Cutover per runbook
  • •Shift-wise floor support
  • •Parallel run where agreed

Deliverables

  • Go-live checklist
  • Reconciliation report
  • Hypercare plan

From your side

A go / no-go decision; users released for go-live shifts.

PHASE 06 · 4–6 weeks

Hypercare

Stabilise on the floor with the team that built it, then hand over to steady-state support.

EXIT GATE

Stability and adoption targets met for agreed period.

Signed by: Product owner and plant head

Activities

  • •Daily issue triage with plant champions
  • •Fixes and small changes
  • •Adoption tracking by plant and role
  • •Refresher training where usage lags
  • •Handover to support

Deliverables

  • Hypercare report
  • Adoption dashboard
  • Support handover pack

From your side

Champions logging issues; managers reinforcing new routines.

PHASE 07 · Ongoing

Scale & improve

Report value against the baseline, roll the template to more sites and keep improving.

EXIT GATE

Value reported against baseline; next wave approved.

Signed by: Steering committee

Activities

  • •Monthly value scorecard review
  • •Template updates from lessons learnt
  • •Wave planning for next sites
  • •Enhancement backlog with your product owner
  • •Quarterly business reviews

Deliverables

  • Value scorecard
  • Updated rollout template
  • Next-wave plan

From your side

Steering committee time; data owners for each metric.

04 · Multi-plant rollout

Prove it once. Template it. Roll it out in waves.

Wave 0

Lighthouse plant

Full design, build and go-live at one representative plant. Every lesson is captured.

Template

Global template

Processes, masters, roles, reports and integrations packaged as a reusable template.

Waves 1…N

Site rollouts

Plants grouped by similarity. Each site does a fit-gap against the template, not a fresh design.

Centre of excellence

Run & improve

A joint team owns the template, governs changes and plans enhancements.

The template carries

Process flowsMaster data standardsRoles & approvalsReports & dashboardsIntegration configsTraining kitsCutover runbook

05 · Governance

A governance rhythm that keeps leadership informed without slowing the work.

Steering committee

Monthly

CXO sponsor, plant heads, CIO, Trikaan leadership

Value scorecard, milestones, top risks, decisions needing leadership, budget.

Programme review

Fortnightly

Product owner, IT head, engagement lead, architect

Plan vs actual, scope changes, dependencies, risk register.

Sprint demo

Every 2 weeks

Process owners, users, delivery team

Working software on staging; feedback logged as stories.

Daily stand-up

Daily

Delivery team, client product owner

Progress, blockers, decisions needed today.

Who does what — RACI for a typical programme

R = Responsible · A = Accountable · C = Consulted · I = Informed

ActivityYour sponsorYour product ownerYour ITPlant headTrikaan leadTrikaan team
Business case & scopeARCCRI
Process designIACRCR
Solution architectureICAIAR
Integration with ERPICAIAR
Master data cleansingIACRCR
Build & configurationICIIAR
UATIACRCR
Go / no-go decisionARCRCI
Training & adoptionIAIRAR
Value reportingARICRC

06 · Risk management

A live risk register, reviewed every week.

  • HIGH

    Master data quality lower than expected

    Mitigation: Profiling in assessment; cleansing workstream with owners and weekly targets.

  • HIGH

    Key users unavailable during peak season

    Mitigation: Plan UAT and go-live around your production calendar; backups named.

  • MED

    ERP integration changes on your side

    Mitigation: Versioned integration contract; contract tests run on every build.

  • MED

    Network gaps at plants or in the field

    Mitigation: Offline-first apps and buffering edge gateways.

  • MED

    Resistance to new ways of working

    Mitigation: Plant champions, local-language training, early involvement in design.

  • LOW

    Hardware lead times for sensors or gateways

    Mitigation: Survey early, order in design phase, reuse existing PLC data first.

07 · Change control

Scope changes are welcome. Surprises are not.

  1. 1

    Raise

    Anyone can raise a change request with a business reason.

  2. 2

    Assess

    We estimate impact on scope, time, cost and risk within [X] working days.

  3. 3

    Decide

    Product owner approves; large changes go to the steering committee.

  4. 4

    Plan

    Approved changes enter the backlog with a priority.

  5. 5

    Track

    All changes logged in the change register.

  6. 6

    Report

    Cumulative impact shown in every programme review.

08 · Adoption & change management

Software is only live when the night shift uses it without calling anyone.

Leadership

Sponsor messaging

Why the change matters, said by your leaders, not by us.

Plant

Plant champions

One trained champion per shift who answers first questions.

Users

Role-based training

Short, task-based sessions per role, in local languages.

Users

In-app guidance

Help, checklists and tips where the work happens.

Floor

Shift-wise go-live support

Our team on the floor across shifts during go-live.

All

Adoption dashboard

Who is using what, by plant and role, every day.

All

Feedback loop

Every suggestion logged and answered.

IT

Admin enablement

Your admins trained to manage users, roles and masters.

09 · Value realisation

We baseline before we build, and report value — not activity.

A value scorecard is agreed at the end of assessment. Each metric has an owner, a baseline, a target and a data source. The steering committee sees it every month.

Value leverMetricOwnerBaselineTargetSource
YieldOutput vs input by product and stagePlant head[Measured][Agreed]Production & lab records
DowntimeUnplanned stop hours per machineMaintenance head[Measured][Agreed]Machine signals
InventoryDays of inventory and dead stockSupply chain head[Measured][Agreed]Stock ledger
Cost accuracyEstimated vs actual cost per orderCFO[Measured][Agreed]Costing & finance
Cycle timeOrder to dispatchOperations head[Measured][Agreed]Orders & dispatch
QualityRejection and rework rateQuality head[Measured][Agreed]Inspection records
Reporting effortHours spent preparing MISCFO[Measured][Agreed]Time study
Field productivityVerified visits per officer per daySales / agri head[Measured][Agreed]Field app

Example scorecard. Metrics are chosen per programme; baselines and targets are set with your team.

10 · After go-live

Support tiers that match how critical the system is to you.

SeverityExampleFirst responseTarget resolutionUpdates
P1 · CriticalProduction or dispatch stopped, no workaround[15 min][4 hours]Every [30 min]
P2 · HighMajor function impaired, workaround exists[1 hour][1 business day]Every [4 hours]
P3 · MediumMinor function issue, low impact[4 hours][5 business days]Daily
P4 · LowQuestion or enhancement request[1 business day]Planned releaseOn release

[All response and resolution times are placeholders, to be confirmed per support plan and contract.]

Release management

Planned releases with notes, staging tests and your approval.

Quarterly business review

Value scorecard, usage, issues and roadmap with leadership.

Continuous improvement

Backlog of improvements prioritised with your product owner.

Knowledge transfer

Runbooks and admin guides so your team can own more over time.

Questions leadership teams ask

How long until we see value?

+−

A plant assessment takes 2–4 weeks and a pilot 8–14 weeks. Most clients see measured movement on the pilot’s scorecard within the first quarter after go-live.

Do we have to standardise all plants first?

+−

No. We prove the design at one lighthouse plant, package it as a template and let each site do a fit-gap against it, so standardisation happens wave by wave.

How much of our team’s time do you need?

+−

A sponsor for monthly steering, a product owner for a few hours a day, process owners for workshops and demos, and key users during UAT and go-live.

Fixed price or time and materials?

+−

Assessments and pilots are usually fixed price against a baselined scope. Enterprise programmes are phased, with each wave priced once its scope is signed.

What happens if we disagree with a deliverable?

+−

Phases close only on your written sign-off. Open points are logged against the exit gate and resolved before we move on, with escalation to the steering committee if needed.

Can you work with our existing IT partner?

+−

Yes. We agree an integration contract and a RACI with your partner up front, so ownership of each system and interface is clear.

What if a key Trikaan person leaves?

+−

Every role has a named backup, decisions and designs are documented as we go, and the engagement lead owns continuity. Replacements are agreed with you.